Development of road ...Development of road From Nalinipothar
to NHK # 220 via NHK # 129 with 150
MM GSB, 150 MM WBM (2 layers of
75 MM) & 40 MM SDBC including supply of all materials.(Total approximate Length =2.30 KM,Width= 3.66 Meters)
Construction of Pucc...Construction of Pucca Road (Dust Free
Road) by providing 20 mm thick Premix carpeting with Seal Coat over two coat
of WBM (of thickness 75 mm each) over a coat of 100mm thick Granular sub base and construction of 1.50 m wide earthen shoulder including supply of all materials except Bitumen at
approach road to Well No KLN#38,
10,28,24,25 & SKL#3 at Kathaloni Area for a total of length 7.10KM.
Construction of Peri...Construction of Perimeter RCC framed
brick boundary wall of approx.
5596.00m length as per standard
drawing, 2 no’s Gate office, 2 no’s Permanent Morcha, 6 no’s Security watch tower as per standard drawing, Security patrolling track approx 6000.00 mtr. Length by the side of boundary wall at Moran Oil Township (Industrial & Housing area), Moran under Sivsagar district including supply of all materials except Cement.
Construction of Thre...Construction of Three Storied CSR Activity Complex Building adjacent to HTPC Complex, Duliajan including supply of all materials except Cement