11871 | G026316L15 | Necessary fabricatio...Necessary fabrication works including supply of materials, erection and services with hiring welding and cutting sets at PHQ-Noonmati and surrounding areas. | Limited | 19-02-2015 | Details |
11872 | DIS6285L15/L5 | SPARES FOR KIRLOSKAR...SPARES FOR KIRLOSKAR MAKE DIESEL ENGINE MODEL NO. 6SL-8800TA FOR 250 KVA GENSET AT IT DEPTT. | Limited | 18-02-2015 | Details |
11873 | DIS6282L15/L5 | LUBRICANTS FOR USE A...LUBRICANTS FOR USE AS CONSUMABLES IN ENGINES, COMPRESSORS, PUMPS, WORKSHOP EQUIPMENT AND OTHER EQUIPMENT ENGAGED IN DRILLING, PRODUCTION, TRANSPORT AND EXPLORATION OF HYDROCARBON. | Limited | 18-02-2015 | Details |
11874 | KIS6254L15/05 | ALLOY STEEL FULL THR...ALLOY STEEL FULL THREADED STUD BOLT, MATERIAL - ASTM A-193,GRADE B7 OR EN19 WITH 2 (TWO) HEAVY HEXAGONAL NUTS,MATERIAL - ASTM A-194, GRADE 2H OR EN19 | Limited | 18-02-2015 | Details |
11875 | SSG6261P15 | for the supply of 72...for the supply of 72,000 KG of Tri-ethylene glycol (99% purity). | Global | 17-02-2015 | Details |
11876 | SSG6209P15 | CASING, API, SEAMLES...CASING, API, SEAMLESS STEEL, SCREWED & COUPLED, WITH API MONOGRAM, IN RANGE 3 LENGTH BUT MAXIMUM LENGTH OF EACH JOINT SHALL BE RESTRICTED TO 12.19 MTRS. (40 FT.) FITTED WITH PRESSED STEEL OR ELASTOMER-CUM-METTALIC (COMPOSITE) THREAD PROTECTOR. | Global | 17-02-2015 | Details |
11877 | DIS6278L15/L1 | Dissolved Acetylene ...Dissolved Acetylene gas conforming to IS 308:2993-05 (Edition 4.1) to be supplied in OIL owned cylinders of average capacity 6 cubic meter/cylinder. The empty Acetylene cylinders to be inspected, tested and repaired as per stipulations of IS 8198 (Part 4), - 1984 & and painted as per IS - 4379, before filling up of the dissolved Acetylene (Gas). | Limited | 17-02-2015 | Details |
11878 | CGI6206P15 | Hiring the Services ...Hiring the Services of WCLs (Works Contract Labour Listed) for unskilled services of Attendant Staff Guest House(SGH), Attendant Executive Guest House(EGH), Sweeper/ Sanitary cleaner(Industrial and Domestic), Gateman/Main gate attendant and Repeater Station Attendant at RS12(Binnaguri) under PS7(Madarihat) , West Bengal. | National | 17-02-2015 | Details |
11879 | CDI6175P15 | Construction of Flar...Construction of Flare Pit Boundary Wall, Steel Gate and Approach road for LPG Deptt. & Production (G) Deptt. near Recovery Plant inside Main Industrial Area, Duliajan. | National | 16-02-2015 | Details |
11880 | CDI6174P15 | Construction of appr...Construction of approach road(including diversion of approach road of about 155.00 m); Construction of Plinth, road over Plinth, effluent pits C.C/R.C.C. Foundations for WDW#166(NHK 207 PLINTH) at NHK(N/S)area. | National | 16-02-2015 | Details |