HIRING OF
CONSULTAN...HIRING OF
CONSULTANCY
SERVICES FOR PROJECT
MANAGEMENT (PMC)
FOR 5 NOS. OF
MICROTUNNELLING
WORK AND
INSTALLATION OF
HYDROCARBON
PIPELINES INSIDE THE
TUNNEL ALONG OIL’S
ROW/ROU IN THE STATE
OF ASSAM AND WEST
BENGAL
Construction of Dust...Construction of Dust Free Bituminous approach
road to well no. MRN#85 at Moran (Total length
570.00 mtr & width 3.75 mtr.) by providing 100
mm GSB, 75 mm thick WBM (2 layers) & 25mm
thick SDBC including supply of all materials by
the contractor.
Construction of Dust...Construction of Dust Free Bituminous approach
road to well no. MRN#31 at Moran (Total length
480.00 mtr & width 3.75 mtr) by providing 100
mm GSB, 75 mm thick WBM (2layers) & 25 mm
thick SDBC including supply of all materials by
the contractor.
Repairing of approac...Repairing of approach road, Construction of
Plinth, R.C.C. Foundations for WDW 216 & WDW
217 at cluster well plinth of WDW178 in Barekuri
area under Tinsukia District including supply of
all materials & equipment except Cement.
Construction of Dust...Construction of Dust Free Bituminous approach
road of well no. MRN#102 at Moran (Total length
1270.00M & width 3.75 mtr) by providing 100mm
GSB, 75mm thick WBM (2 layers) & 25mm thick
SDBC including supply of all materials by the
contractor.
Construction of Dust...Construction of Dust Free Bituminous approach
road to well no. MRN#69 (Total length 1240.00
mtr & width 3.75 mtr) by providing 100 mm GSB,
75 mm thick WBM (2layers) & 25 mm thick SDBC
including supply of all materials by the
contractor.
Best Price on Fixed ...Best Price on Fixed Menu Rate Model Vegetarian, Non-Vegetarian; Breakfast, Lunch, Dinner, Snacks, Beverages; Inside Building Premises (exclusive for employees/ patients/ in house personnel)