As on

556

NSE

536

BSE
  • As on
  • 556NSE
  • 536BSE

Profile
Sr. No.Tender NoTitleTender CategoryPost DateDetails
2481GEM/2022/B/2229206Corrigendum No. 01 t...Corrigendum No. 01 to GeM Tender No. : GEM/2022/B/2229206 dtd. 02/06/2022GEM23-06-2022Details
2482CGI0451L23Necessary cement con...Necessary cement concrete work in front of control room, pump house & CEG building at new project area PS-9, Dumar.Limited23-06-2022Details
2483CDC0627P23Construction of Dust...Construction of Dust free road to Loc. DIP from Loc. DGF (Length =910.00 m + 2525.00 m = 3435.00 m) with 100 mm GSB, 150 mm WBM & 25 mm thick SDBC including supply of all materialsNational23-06-2022Details
2484CDC0625P23Construction of Bitu...Construction of Bituminous road (850.00 Mtr) by replacement of existing damaged HPC, Construction of 150 MM thick GSB, 75 MM thick WBM (Two layers), applying prime coat, tack coat, 50 MM thick BM & 40 MM thick SDBC with side drains and providing paver block at road edges (wherever necessary) along the road from Tipling Army camp to GCS-3 Project Godown via CBUS, including supply of all Materials by contractor.National23-06-2022Details
2485CGI0550P23Geotech Study at 3 R...Geotech Study at 3 River (Diphalu,kaliyani & Gangiya) Locations in the state of Assam for conversion of existing sections of NSPL and NBPL to HDD/Micro-Tunnelled sectionsNational23-06-2022Details
2486CDC0629L23Construction of R.C....Construction of R.C.C framed brick boundary wall with Y overhang fixed with concertina coil fencing at top for a length of 525.00 meters at Kumchai EPS, Arunachal Pradesh.Limited23-06-2022Details
2487CDC0626L23Construction of Over...Construction of Overhead shed at COCP Yard for ICE Field & WI section of Field Engineering Department inside Industrial Area, Duliajan, and supply of all materials except cement.Limited23-06-2022Details
2488CDC0636L23Construction of CC m...Construction of CC matress inside the Tank dyke at ITF, Tengakhat, Approx. area of CC Matress is 2700.00 Sq. mtsLimited23-06-2022Details
2489CDC0638L23Construction of two ...Construction of two nos. Bath Heater foundation at ITF-Tengakhat, (i)Skid Foundation. (ii)Shed Extension. (iii)Site & road development etc.Limited23-06-2022Details
2490SJG0658L23Supply of Rock Bit, ...Supply of Rock Bit, 26", IADC 1-3-1Limited23-06-2022Details