Construction of dust...Construction of dust free approach road to well
NHK #213 under OCS-1 (Approx. Length 700 m
with 100 mm GSB, 2 layers 75 mm WBM & 25
mm thick SDBC) including supply of all materials.
SYNCHRONOUS ON-OFF P...SYNCHRONOUS ON-OFF PSP SURVEY FOR HYDROCARBON PIPELINES HAVING CATHODIC PROTECTION IN ROW/ROU OF PIPELINE DEPARTMENT OF OIL INDIA LIMITED IN THE STATES OF ASSAM,WEST BENGAL AND BIHAR FOR A PERIOD OF TWO YEARS
Hiring of warehouse ...Hiring of warehouse facility with open yard in Cuttack or Khordha or
Jagatsinghpur or Kendrapara districts in the state of Odisha for storage of
materials like heavy steel tubular and Drilling & production consumables
inclusive of Logistic Services consisting of: Item 1 - Hiring of Minimum 14 MT
Hydra Crane (Pick & Carry), Item 2 - Hiring of Minimum 20 MT Tractor-Trailers &
Item 3 - Hiring of Minimum 40 MT Crane (on call out basis) for OIL's operational
areas in Odisha for
Hiring the services ...Hiring the services of 04 (Four) units Surface
Production Facility packages for OIL’s operational areas in Assam and Arunachal
Pradesh for a period of 03 (Three) years.
SUPPLY, INSTALLATION...SUPPLY, INSTALLATION AND
COMMISSIONING OF CATHODIC
PROTECTION TEST LEAD POINTS FOR
NAHARKATIYA - BARAUNI MAIN CRUDE
OIL PIPELINE IN RIGHT-OF-WAY OF
PIPELINE DEPARTMENT OF OIL INDIA
LIMITED IN THE STATES OF BIHAR,WEST
BENGAL AND ASSAM.