Repairing and Streng...Repairing and Strengthening of Existing Bituminous Road from damaged portion of Soraipung tinali upto damaged portion of Maya bazar ( Total Length= 2.40 Kms.) by repairing WBM, laying 50 MM thick BM & 40 MM thick SDBC with road furniture including supply of all materials except cement
OPERATION AND MAINTE...OPERATION AND MAINTENANCE OF CROSS COUNTRY CRUDE OIL
PIPELINES ACROSS THE STATE OF ASSAM, WEST BENGAL & BIHAR AND PRODUCT PIPLEINES ACROSS THE STATE OF ASSAM & WEST BENGAL
Charter hire of 1 (o...Charter hire of 1 (one) no. Jack-Up Drilling Unit along with equipment and Marine Logistics for drilling, testing and completion of drilling wells in water depths of minimum 9 mts in Indian Waters for a period of 10 (Ten) months or till completion of 04 (Four) wells, extendable by another 05 (Five) months for an optional well or otherwise at the same rates, terms and conditions