Construction of 910.00 m long graveled approach road as per OIL Standard, construction of plinth, road over plinth, effluent pits with suitable bundhs / embankments etc.; construction of C.C/R.C.C. foundations with pillows to suit E- 3000 AC/SCR (S-08) Rig Outfit for Loc. DIF and construction of RCC Dwarf wall along the OIL Boundary of the plinth.