Repairing of pot holes with premixing developed at the existing approach road (black topped portion) of 4.9km long, originating from the Junction point of NH-214 near Kasivarithumi village leading to Loc TLK#1, with light jungle cutting repairing of side berm including supply of all materials and machinery.