Development of Bituminous Road from DBY-
DJN Main Road to FGGS Kusijan by
repairing/re-strengthening the existing
damaged road with the laying of new WBM
(Water Bound Macadam), laying 25mm thick
SDBC and Seal Coat including supply of all
materials by the contractor except Cement.
Total Length of the proposed road = 0.660
Kms.