Construction of Dust Free road over existing
gravel road leading to Loc.HUN-1 by
construction of 150 MM GSB, construction of
two layers of 75 MM thick WBM, 20 MM thick
premix carpeting, applying tack coat & seal
coat including supply of all required
materials by the contractor.