Construction of Bituminous Road in the backside of Moran Power Station by Construction of 150.00 MM thick
GSB,150.00 MM thick Gravel, Two
layers of 75.00 MM thick
W.B.M.Applying Tack Coat
,Construction of 20.00 MM thick
Premix-Carpeting,Placement of Hume
Pipe Culvert,Placing Paver Blocks
etc.including supply of all materials
except Cement,Bitumen & Hume Pipe
Culverts