Development of an area in existing effluent pit with construction of walkway/footpath and drainage system around newly proposed RCC effluent pit area, development of an area of 20m x 20m (approx.) for setting up of the proposed ETP, developing an area (20m x 15m) for construction of proposed RCC safe disposal pit, construction/development of approach road in sides of effluent pit area, towards flare pit area and around chemical mud tank area by RCC at Kathalguri Mud Plant including supply of all