Construction of Dust Free Bituminous Approach road to (i) Well SLM-13 length 120.0 mtr & (ii) SLM-08 length 350.0 mtr in Shalmari area by 100 mm GSB, 75 mm thk WBM (Double layer) & 25 mm thk SDBC including supply of all quarry materials & bitumen supply by the contractor