Construction of Bituminous road (850.00 Mtr)
by replacement of existing damaged HPC,
Construction of 150 MM thick GSB, 75 MM
thick WBM (Two layers), applying prime coat,
tack coat, 50 MM thick BM & 40 MM thick
SDBC with side drains and providing paver
block at road edges (wherever necessary) along
the road from Tipling Army camp to GCS-3
Project Godown via CBUS, including supply of
all Materials by contractor.