Repairing of road from Modhuting Tea factory to
Limbu tinali by scarifying the existing road
surface, spreading gravel as per requirement,
construction of one layer WBM surface up to
Chainage 00 km to 1.5 km & Laying 40 mm thick
Semi dense Bituminous concrete up to chainage
1.80 km including supply of all materials.