411 | CDC4830P24 | Construction of 7 no...Construction of 7 no's CC matress inside the Tank dyke at ITF, Tengakhat | National | 15-11-2023 | विवरण |
412 | CDC4827P24 | Construction of Pucc...Construction of Pucca Road over the existing road by providing GSB, WBM,80 mm CC Paver Block & 40mm SDBC from Alimur Tinali to Dikom railway crossing, including supply of all materials except cement | National | 15-11-2023 | विवरण |
413 | G024867L24 | Repairing & Reno...Repairing & Renovation work at Kaziranga Club, PS-4, Sekoni including supply of all materials | Limited | 14-11-2023 | विवरण |
414 | G024866L24 | Repairing & Reno...Repairing & Renovation work at Employee Guest House, PS-4, Sekoni including supply of all materials | Limited | 14-11-2023 | विवरण |
415 | G024868L24 | Tarfelting works to ...Tarfelting works to arrest roof leakage and repairing of damaged ceiling of Control room at PS-4, Sekoni including supply of all materials except Bitumen | Limited | 14-11-2023 | विवरण |
416 | GEM/2023/B/4206426 | HYDRAULICALLY ACTUAT...HYDRAULICALLY ACTUATED ARTIFICIAL LIFTING UNIT (HAAL UNIT) / HYDRAULIC SUCKER ROD PUMP (HSRP) | GEM | 14-11-2023 | विवरण |
417 | GEM/2023/B/4193412 | Casing CouplingCasing Coupling | GEM | 14-11-2023 | विवरण |
418 | CDC4906L24 | Repairing the ring r...Repairing the ring road of Ushapur OCS (approx. length 710 meter) by double layer 75mm WBM, 40 MM SDBC, replacement of existing damaged HPC, inside Ushapur OCS including supply of all materials by contractor | Limited | 11-11-2023 | विवरण |
419 | CDC4905L24 | Revamping of Bitumin...Revamping of Bituminous road at the approach road leading to JNG#4(Bahadur) by 150 mm Granular Sub-base, Spreading Gravel, 75mm thick Double layer WBM, 40mm thick SDBC in approximate road length 1210 meter including supply of all materials | Limited | 11-11-2023 | विवरण |
420 | CDC4904L24 | Construction of dril...Construction of drilling location for water disposal well by construction/repairing of approx. 400 meter approach road, repairing and extension of hardstanding area, dewatering/desilting and repairing of effluent pit with suitable bunds/embankment, construction of CC/RCC foundations with pillow foundations to suit DM-05 Rig outfit at any location or multiple locations in Central Field-East area including supply of all materials except cement | Limited | 11-11-2023 | विवरण |