Hiring services of o...Hiring services of one brand new
Mahindra Bolero B4 BS6 vehicle for Oil
Movement Section- PHQ, Narengi for a
period of 4 (four) years
Hiring of Service fo...Hiring of Service for Supply of Listed WCLs for
providing round the clock „Watch and Ward? duty in OIL operational area of
Assam.
Construction of Bitu...Construction of Bituminous approach road to
NHK#550 under NKF#QPS of length 300 Mtr
(approx.) at Duliagaon area with 150 mm GSB,
75 mm thick WBM (2nd layers), 20 mm thick
Premix Carpeting including supply of all
materials by contractor except Bitumen.
Construction of Bitu...Construction of Bituminous road (320 Mtr)
from main gate to process area inside
NKF#QPS with 75 mm WBM (2nd layers), 20
MM Premix including supply of all materials by
contractor except Bitumen.
Construction of appr...Construction of approach road of well NHK#165
under OCS-1 (approx. length 650 m) by 100 mm
GSB, 150 mm WBM (in two layers 75 mm each),
20 mm premix carpeting with seal coat
including supply of bitumen & all materials.
Construction of Five...Construction of Five numbers of RCC watch
tower for proposed Tank Farm at Naoholia as
per standard drawing including supply of all
materials except cement.
Construction of Patr...Construction of Patrolling Track along the
boundary wall by earth filling, single layer brick
soling & CC work at proposed Secondary Tank
Farm, Naoholia (Approx. = 2307.00 Mtr length)
including supply of all materials except cement.