4191 | CDI7617P22 | Hiring services of s...Hiring services of supplying qualified & experienced
professionals to be engaged temporarily at executive cadre on call-out basis in
operational area(s) or installation(s) of Oil India Limited within India. | National | 26-07-2021 | विवरण |
4192 | CDI7651P22 | Hiring of miscellane...Hiring of miscellaneous Electrical Wiring
Jobs in offices, fields, housing and civil installations in Assam and
Arunachal Pradesh for a period of three (03) years. | National | 24-07-2021 | विवरण |
4193 | CGI6802P22 | Providing services f...Providing services for Dig-
verification of pipe for defects
reported during I.P. Survey and re-
coating by 3PLE tape after repair by
welding sleeves from PL KM 0 (PS1,
Duliajan) to PLKM 401 (PS5 ,
Noonmati) | National | 24-07-2021 | विवरण |
4194 | CGI7557P22 | Services of RoW/RoU ...Services of RoW/RoU Patrolling by
line walking method from PL KM
post 214 (Kaziranga) to PL KM post
351 (Kopili up stream), stretching
through Golaghat, Nagaon &
Morigaon Districts of Assam, under
Pump Station No.4 (Sekoni) of Oil
India Limited for a period of Two
Years with a provision of extension
of another one year | National | 23-07-2021 | विवरण |
4195 | CDC7585L22 | Earth filling in the...Earth filling in the portion of land from the near
home guard barrack to the effluent pit within
the boundary fencing for CBA # 3 EPS, Chabua
area. | Limited | 22-07-2021 | विवरण |
4196 | CDC7584L22 | Repairing of approac...Repairing of approach road, construction of plinth
with effluent pits and construction of RCC
foundation to suit DM-05 rig for any location at
Makum, Hapjan area of Tinsukia district
including supply of all materials and equipment
except cement. | Limited | 22-07-2021 | विवरण |
4197 | CDC7583L22 | Construction of dust...Construction of dust free road to LOC TAM, TBK
TBL TBP &TBO of length 1.1KM. | Limited | 22-07-2021 | विवरण |
4198 | CDC7582L22 | Repairing of road fr...Repairing of road from Modhuting Tea factory to
Limbu tinali by scarifying the existing road
surface, spreading gravel as per requirement,
construction of one layer WBM surface up to
Chainage 00 km to 1.5 km & Laying 40 mm thick
Semi dense Bituminous concrete up to chainage
1.80 km including supply of all materials. | Limited | 22-07-2021 | विवरण |
4199 | CDC7581L22 | Construction of equi...Construction of equipment shed at OGPS-WC&I
premises, Duliajan including supply of all
materials except cement. | Limited | 22-07-2021 | विवरण |
4200 | CDC7580L22 | Construction of dust...Construction of dust free road from Guijan
tiniali towards LOC # TAF ( Ch. 0.00 m to Ch.
900.00 m) Chabua area. All materials to be
supplied by contractor except cement. | Limited | 22-07-2021 | विवरण |