As on

556

NSE

536

BSE
  • As on
  • 556NSE
  • 536BSE

Profile
सीरीयल नम्बरनिविदा नंबरशीर्षकनिविदा श्रेणीपोस्ट करने की तारीखविवरण
421CDC4902L24Construction of Bric...Construction of Brick Wall over the Retaining Wall around the Hebeda GCS including supply of all materials except cementLimited11-11-2023विवरण
422CDC4903L24Re-Construction of r...Re-Construction of road from Majgaon, Langkashi to Dhulijan by gravelling, WBM and 40mm SDBC (Total Length of road 1.10 KM)Limited11-11-2023विवरण
423CDC4898L24Construction of Dust...Construction of Dust Free road in the approach of Loc TBQ at Baghjan areaLimited11-11-2023विवरण
424CDC4893L24Land development by ...Land development by earth filling for Modular ETP & Generator Shed in frontal area of Kathalguri OCS including supply of all materials by contractorLimited11-11-2023विवरण
425CDC4865L24Development of an ar...Development of an area in existing effluent pit with construction of walkway/footpath and drainage system around newly proposed RCC effluent pit area, development of an area of 20m x 20m (approx.) for setting up of the proposed ETP, developing an area (20m x 15m) for construction of proposed RCC safe disposal pit, construction/development of approach road in sides of effluent pit area, towards flare pit area and around chemical mud tank area by RCC at Kathalguri Mud Plant including supply of allLimited11-11-2023विवरण
426CDC4834L24Construction of dril...Construction of drilling location for water disposal well by construction/ reparing of 200 meter approach road, repairing and extension of hardstanding area, dewatering/desilting and repairing of effluent pit with suitable bunds/embankment, construction of CC/RCC foundations with pillow foundations to suit DM-05 Rig outfit at any location or multiple locations in Central Field-East area including supply of all materials except cementLimited11-11-2023विवरण
427CDC4829L24Repairing the entire...Repairing the entire concrete floor of Group area inside Tengakhat OCSLimited11-11-2023विवरण
428CDC4828L24Earth filling of the...Earth filling of the U shaped low laying area behind the CODP shed till near the 160KLS crude oil tank in side of HJC # QPSLimited11-11-2023विवरण
429CDC4832L24Development of OGPL ...Development of OGPL & P pipe yard near Madhuting by supply & filling of earthLimited11-11-2023विवरण
430CDC4826L24Construction of appr...Construction of approach road, construction of plinth, road over plinth, de-silting of effluent pits,construction/modification of cc/rcc foundations with pillow foundations to suit VFD-01 rig outfit over any existing location on cluster basis in Dikom, Kathaloni & Bhogpara area or any area under Central Field West in Dibrugarh District including supply of all materials except cementLimited11-11-2023विवरण